The scope of work was to conduct an investigation of the Client’s ammonia system and identify critical issues to be remediated. The owner required subsequent engineering solutions for the issues, and ultimately fabrication / construction of the engineered solutions.
Rally provided an inspection report of the Client’s terminal. The report identified concerns and operational risks with recommendations for correction of identified deficiencies.
Rally completed the EDS and Detailed Engineering for the identified efficiencies.
Construction support was initiated and included civil / structural, piping, and mechanical for the duration of construction.
Download PDF